top of page

64m Footbridge Installation over Afon Cothi | Tywi Valley Footpath Project

  • Writer: Loca Media News
    Loca Media News
  • Nov 14
  • 1 min read
ree

Tywi Valley Footpath | 64m Footbridge Installation at Nantgaredig

This week has been incredibly busy on the Tywi Valley Footpath project as our team worked alongside Walters to complete the installation of a 64 metre footbridge over the Afon Cothi in Nantgaredig.

Despite tough weather conditions, the team showed outstanding focus, dedication and technical ability to deliver this major lift safely and efficiently. The bridge is now fully in place and marks another key step forward for the scheme.

In this video you will see• The full lift and placement of the 64m footbridge• Teamwork between contractors on site• A closer look at the engineering process behind a large scale footbridge installation• Real time footage captured in challenging weather conditions

If you follow civil engineering, infrastructure upgrades, steelwork installations, or large crane operations, this is a great insight into the work that goes on behind the scenes.

More project updates coming soon.


 
 
 

Comments


Screenshot_2022-03-02_at_20.25.56-removebg-preview.png
  • LinkedIn
  • Facebook
  • Instagram
  • X
  • TikTok
  • Youtube

© 2022 by LOCA Construction Limited. Created by @MGBWebSolutions

bottom of page