top of page

Precision Lifting at Darlington Station: 750‑Tonne Crane

  • Writer: Loca Media News
    Loca Media News
  • Jun 20
  • 1 min read

Updated: Aug 14

ree

One of the standout moments in our work at Darlington Station was the deployment of a 750-tonne Mammoet crane, assembled on-site using a 90-tonne support crane.

This engineering giant was used to lift prefabricated footbridge section measuring up to 31 metres long and weighing over 30 tonnes, through a carefully cut opening in the station’s Victorian roof.

This wasn’t just about raw lifting capacity, it was about combining modern infrastructure with heritage sensitivity. The successful lift marked a major milestone in the £140 million transformation of the station Learn More Here


 
 
 

Comments


Screenshot_2022-03-02_at_20.25.56-removebg-preview.png
  • LinkedIn
  • Facebook
  • Instagram
  • X
  • TikTok
  • Youtube

© 2022 by LOCA Construction Limited. Created by @MGBWebSolutions

bottom of page